Work package | Deliv. Number |
Deliverable Name |
Author | Dissemination Level |
Status | Content for Download |
---|---|---|---|---|---|---|
D1.1 |
Consortium Agreement |
Confidential |
Approved |
|||
D1.2 |
Project Management Plan |
Confidential |
Approved |
|||
D1.3 |
Data Management Plan |
Confidential |
Approved |
|||
D2.1 |
Delta Analysis Report |
Confidential |
Approved |
|||
D2.2 |
Comparison of on Board Power Supply Systems for Cruise Ships |
Confidential |
Approved |
|||
D3.1 |
Safety and Regulatory Requirements for Integration of Genset |
Confidential |
Approved |
|||
D3.2 |
Operation of the hybrid genset |
Confidential |
Upcoming |
|||
D3.3 |
Sizing of genset and scalability to multi-MW |
Confidential |
Submitted |
|||
D3.4 |
PoC operation report |
Confidential |
Upcoming |
|||
D3.5 |
Genset simulator tool |
Confidential |
Upcoming |
|||
D4.1 |
Onboard Arrangement Strategy |
Confidential |
Submitted |
|||
D4.2 |
Auxiliary, Fuel Supply and Exhaust Venting Systems |
Confidential |
Submitted |
|||
D4.3 |
Electrical and Thermal Energy System Integration |
Confidential |
Submitted |
|||
D4.4 |
Preliminary Energy/Emission System Simulation |
Confidential |
Submitted |
|||
D4.5 |
Energy/emission system simulation report for the chosen cruise ships |
Confidential |
Upcoming |
|||
D5.1 |
Battery Management Unit (BMU) |
Confidential |
Approved |
|||
D5.2 |
Report on Battery Management Unit |
Confidential |
Approved |
|||
D5.3 |
Unitized control algorithm for hybrid genset and 60 kWe demonstrator |
Confidential |
Approved |
|||
D5.4 |
Control interface and integration with ship |
Confidential |
Submitted |
|||
D6.1 |
Safety report on the tests of fuel cell unit on the inclination pod |
Confidential |
Approved |
|||
D6.2 |
Drawings and layout for design on battery container |
Confidential |
Submitted |
|||
D6.3 |
Drawings and layout for the design of FC cabinet |
Confidential |
Approved |
|||
D7.1 |
LCA report |
Public |
Approved |
|||
D7.2 |
Genset Performance with Future Fuels |
Public |
Approved |
|||
D7.3 |
Techno Economic Analysis |
Confidential |
Approved |
|||
D7.4 |
LCA final report |
Confidential |
Submitted |
|||
D7.5 |
Emission analysis |
Confidential |
Upcoming |
|||
D8.1 |
NAUTILUS PR Kit |
Public |
Approved |
|||
D8.2 |
IPR Strategy |
Confidential |
Approved |
|||
D8.3 |
Plan for Exploitation and Dissemination of Research |
Confidential |
Approved |
|||
D8.4 |
Workbook for public workshop |
Public |
Approved |
|||
D8.5 |
Exploitation and technology transfer |
Confidential |
Upcoming |
|||
WP 9 |
D9.1 |
NEC - Requirement No. 1 |
Confidential |
Approved |
Last updated: November 21, 2024